Geography
JSC “PTA “Atlant” – is a Russian manufacturer of pipeline fittings for the needs of the energy, gas and petrochemical industries
|
Supply of the facilities with pipeline parts within the shortest time, solution of the problem with non-standard equipment manufacturing conditions.
Execution of work on production and supply of equipment in 20-day period.
In the shortest time (7 days) was implemented the project on supplying the Central stadium of Sochi with cable and wire production.
Re-equipment with installation of two CCGT-165 (PGU-165).
Compressor shop with gas air cooling unit (004); Pump storage of methanol; compressor shop with gas air cooling unit.
Gas piping unit №№6, 7; Installation of switching devices at well 41 (Block B).
JSC "PTA" Atlant" was actively involved in the process of building of the first and second units of Yuzhnouralskaya GRES-2.
All supplies carried out in the shortest time possible, phase-by-phase according to schedule installation.
The supply of stop valves for the reconstruction of “Usinskoye GPZ” was performed in a very short time
Short terms of manufacturing were possible due to partnership with leading manufacturers, which reduced production time by more than two times.
During the first half of 2013 piping and piping components were supplied for the construction of Olympic facilities - Dzhubginskaya TPP.
Due to our experience of working with large-scale energy projects, we were able to complete the project as soon as possible in a limited time and with changes in the design documentation during installation.
Completion of the phase 1 construction work of Nizhnevartovskaya GRES.
Block 3-1. Supply of components for low-pressure pipeline for the main building. The supply was carried out in record time - 10 days.
Reconstruction of the distillation-desalination plant (DDP).
Engineering solutions (work with the Design Institute (renegotiation), complex supply of isolation valves from 9 different manufacturers, working on coordination of the documents with Rostovskaya NPP.
Modernisation with installation of two CCGT-165.
The work consisted in a complex provision of the above-mentioned object all required materials.
Main objective: rapid response, urgent production, and execution of works to ensure the rapid implementation of this project.