Geography
JSC “PTA “Atlant” – is a Russian manufacturer of pipeline fittings for the needs of the energy, gas and petrochemical industries
Kaluga Turbine Works

Kaluga Turbine Works

Production of pipe fittings for urgent repairs.
JSC "NOVATEK Ust-Luga"

JSC "NOVATEK Ust-Luga"

Supply of the facilities with pipeline parts within the shortest time, solution of the problem with non-standard equipment manufacturing conditions.

Execution of work on production and supply of equipment in 20-day period.

Syzranskoye NPZ Oil Refinery

Syzranskoye NPZ Oil Refinery

In the second half of 2015 together with the contractor for the construction of Syzranskoye Oil Refinery was carried out a number of projects for the manufacturing of suspension and support system, blocks with diaphragm and lathe products.

Thanks to our own production and cooperation with the metrology laboratory all the parts were delivered ahead of schedule.
Construction of the Central Stadium "Fischt"

Construction of the Central Stadium "Fischt"

In the shortest time (7 days) was implemented the project on supplying the Central stadium of Sochi with cable and wire production.

Novopolotsky refinery

Novopolotsky refinery

During the reconstruction program of the refinery complex was performed delivery of parts and piping Du508mm and Du356mm with wall thickness 32,54mm and 27,79mm according to the standard ASME B 16.9-2007 of steel grade SA234 Gr.WP5, as well as bent bends of steel 08X18H10T.
Sovhoznoye PHG

Sovhoznoye PHG

Re-equipment with installation of two CCGT-165 (PGU-165).

Compressor shop with gas air cooling unit (004); Pump storage of methanol; compressor shop with gas air cooling unit.

Gas piping unit №№6, 7; Installation of switching devices at well 41 (Block B).

JSC "Yayvinskaya GRES"

JSC "Yayvinskaya GRES"

Repair works of four combined-cycle units.
Yuzhnouralskaya GRES-2

Yuzhnouralskaya GRES-2

JSC "PTA" Atlant" was actively involved in the process of building of the first and second units of Yuzhnouralskaya GRES-2.

All supplies carried out in the shortest time possible, phase-by-phase according to schedule installation.

Renovation "Usinskoye GPZ" Gas processing plant

Renovation "Usinskoye GPZ" Gas processing plant

The supply of stop valves for the reconstruction of “Usinskoye GPZ” was performed in a very short time

Short terms of manufacturing were possible due to partnership with leading manufacturers, which reduced production time by more than two times.

Dzhubginskaya TPP

Dzhubginskaya TPP

During the first half of 2013 piping and piping components were supplied for the construction of Olympic facilities - Dzhubginskaya TPP.

Due to our experience of working with large-scale energy projects, we were able to complete the project as soon as possible in a limited time and with changes in the design documentation during installation.

Nizhnevartovskaya GRES

Nizhnevartovskaya GRES

Completion of the phase 1 construction work of Nizhnevartovskaya GRES.

Block 3-1. Supply of components for low-pressure pipeline for the main building. The supply was carried out in record time - 10 days.

JSC "Priargunskoye Industrial Mining and Chemical Union" (JSC "PPGHO")

JSC "Priargunskoye Industrial Mining and Chemical Union" (JSC "PPGHO")

Supply of isolation valves of European manufacturers, as well as cable and wire products for the needs of re-equipment of the boiler shop.
Rostovskaya NPP

Rostovskaya NPP

Reconstruction of the distillation-desalination plant (DDP).

Engineering solutions (work with the Design Institute (renegotiation), complex supply of isolation valves from 9 different manufacturers, working on coordination of the documents with Rostovskaya NPP.

JSC "Aluminium of Kazakhstan" CHP

JSC "Aluminium of Kazakhstan" CHP

Production in the shortest periods of time of high pressure pipelines for the thorough overhaul of boilers №5 and №7, due to the tight schedule of installation.
LLP "Ekibastuzskaya GRES-1 named after Bulat Nurzhanov"

LLP "Ekibastuzskaya GRES-1 named after Bulat Nurzhanov"

2014-2015 - Production of pipelines of high and low pressure for restoration works in energy unit №2.

2016 – Production of high-pressure steam lines for restoration works in energy unit №1.

The total volume of manufactured pipes is more than 2 000 tons.
Novy Urengoy Gas and Chemical Complex

Novy Urengoy Gas and Chemical Complex

Organization of supply of bends 323,8x25,4 according to the standard ASME B16.9 of material ASTM A234 Gr.WP ll.
CRR Launch Complex №3 Construction of the KGMO pipeline

CRR Launch Complex №3 Construction of the KGMO pipeline

Supply of hot bending parts Du1220mm K55 with anticorrosive coating the PK-40.

Shipment of products was carried out according to the schedule of the construction and installation works.
Samburgskoye field

Samburgskoye field

Our company signed the contract for the manufacture of pipeline fittings for the installation of gas gathering networks 3rd stage, a gas flow-line from pad № 1.

Also was performed re-approval on the design as our technical department identified some errors.
Diaghilevskaya CHP

Diaghilevskaya CHP

2014-2015 - Production of low-pressure pipelines for reconstruction works of energy unit №2.
Yamal LNG facility

Yamal LNG facility

Our enterprise performed, according to the customer’s specifications, the construction of the drill cuttings processing plant within 2 weeks and sent as a separate cargo by freight helicopter to the Yamal Peninsula.
Komsomolskoe refinery

Komsomolskoe refinery

Supply of pipeline fittings and pipe steel products 08H21N6M2T, 10X17H13M2T 06HN28MDT and as soon as possible, as well as organizing the logistics, taking into account the remote location of the facility.
Far Eastern Center of Shipbuilding and Ship Repair

Far Eastern Center of Shipbuilding and Ship Repair

Production of details of chrome-molybdenum steel for the construction of tankers for transportation of crude oil in the Arctic.
Blagoveshenskaya TPP

Blagoveshenskaya TPP

Production of low-pressure piping parts on the oil lines within the program of construction of the second stage of the Blagoveshenskaya TPP.
Yakutskaya HPP-2

Yakutskaya HPP-2

Manufacturing fittings low pressure for the first phase of construction of the power unit №1.
Mendeleevskaya GeoTPP Sakhalin region

Mendeleevskaya GeoTPP Sakhalin region

Supply of industrial pipelines as part of the project "Development of alternative energy sources in the Kuril Islands: first stage, Kunashir island, Yuzhno-Kurilsk. Improving the reliability"
Yugo-Zapadnaya CHPP

Yugo-Zapadnaya CHPP

Production of low pressure pipelines for circulating water supply section to the cooling tower №2.
Vyborg Pulp and Paper mill

Vyborg Pulp and Paper mill

Production of high pressure parts for repairs in the thermal power plant.
Boguchansky Aluminium Plant

Boguchansky Aluminium Plant

2013 Construction of the plant - pipeline units of alumina block. Production of pipeline fittings of steel operating at critically low temperatures.
Boiler room "Centralnaya" Lukoil

Boiler room "Centralnaya" Lukoil

Supply of energy fittings for the construction of CCGT-235MVt.
Aktobe Rail and Beam Plant

Aktobe Rail and Beam Plant

Production and supply of pipeline components for the installation of:
  1. Technological pipeline racks.
  2. Pipelines of gas processing facility
  3. Pipeline of the joint auxiliary building
Our company together with "HPKI" TEP-Soyuz" also performed re-approval of the Finnish stop valving to its Russian counterparts. Thereby the production time was reduced from 12 work weeks up to 5 work weeks.
Zhezkazganskaya CHP

Zhezkazganskaya CHP

2015 - Production of 250 tons of pipelines of high and low pressure for expansion of turbine room №8.

Production time in 90 days
Berezovskaya GRES

Berezovskaya GRES

Production and supply of pipeline components for the installation of:
  1. Pipelines of CPP
  2. Pipelines of the steam blowing system
  3. Pipelines of industrial bleed-off
  4. Pipelines of TH, CS
  5. Oil pipe
During the construction of coal power unit based on PSU-800
Cherepovetskaya GRES

Cherepovetskaya GRES

Manufacturing of pipeline components of low pressure of steel 09Г2С, 08X18H10T for the construction of units №8 and №9 with capacity of 225MVt.
Smolenskaya NPP

Smolenskaya NPP

2014 - Production and supply of pipeline components for the installation of nitric acid plant up the schedule made with the contractor company that carried out the erection of the given project land.
Balakovskaya NPP

Balakovskaya NPP

Manufacturing in 15 days of pipeline components for para-injection machines during the New Year holidays in 2015.

Further work coordinating technical parameters with the design institute.
Armenian NPP

Armenian NPP

Organization of complex supply of equipment in the shortest possible time of installation works.
Nizhnetourinskaya GRES

Nizhnetourinskaya GRES

2015 - Production of drainage pipelines for the turbine hall in 3 work weeks.
Karagandinskaya GRES-1

Karagandinskaya GRES-1

Production of parts of high and low pressure piping for repairs in 2014.
Irkutsk CHP-6

Irkutsk CHP-6

2013 - Manufacture of parts for pipeline repairs.
Verkhnetagilskaya GRES

Verkhnetagilskaya GRES

2013 production of pipeline fittings for the modernization of turbine set K-205-130 st.№10
Gas pipeline "Ananiev-Tiraspol-Izmail"

Gas pipeline "Ananiev-Tiraspol-Izmail"

In 2015 JSC "PTA" Atlant " manufactured bends DU1220 for repair works of gas pipeline "Ananiev-Tiraspol-Izmail"
Syrdarinskaya TPP

Syrdarinskaya TPP

All-in delivery of parts of low pressure pipes and stop valving made of steel 20, 09Г2С, 08X18H10T for the reconstruction of two power units of 300 MW in the Syrdarinskaya Thermal Power Plant
CHP-2, Almaty

CHP-2, Almaty

2014 - Production of high-pressure pipelines during the reconstruction of the steam main.

2015 - Production of pipes of high and medium pressure during the reconstruction and expansion works of the boiler unit №8.
CHP-4, Ulaanbaatar

CHP-4, Ulaanbaatar

2014 - Object "Expanding CHP-4 Ulaanbaatar" Republic of Mongolia. Production of high-pressure pipelines.

2014 - Production of low-pressure pipelines.
Rospan International

Rospan International

2017 - Production of pipe lines for the internal areas of the input flow lines and the primary separation of the formation fluid
Alexin combined heat and power supply plant

Alexin combined heat and power supply plant

2017 - Production of over 150 tons of connection details for the trestle bridge pipe lines
Angarsk factory of polymeric materials

Angarsk factory of polymeric materials

2017 - Production of high pressure details for oil lines
Sumi Frunze-NPO

Sumi Frunze-NPO

2017 - Production of coil pipes for the  bubbled refrigerator-condenser
Kaliningrad underground gas storage facility

Kaliningrad underground gas storage facility

2017 - Delivery of over 300 tons of accessories for construction of the water intake and salt water throw-off (into the Baltic sea) facility
Sevastopol thermal power plant

Sevastopol thermal power plant

2017 - Production of over 800 tons of pipe lines for water running in circles
Simferopol thermal power plant

Simferopol thermal power plant

2017 - Production of over 800 tons of pipe lines for water running in circles
Sokolovsko-Sarbayskoe mining and concentrating production group (SSGPO)

Sokolovsko-Sarbayskoe mining and concentrating production group (SSGPO)

2017 - Production of connection details of the pipe line for construction works
GRES power plant, Topar village

GRES power plant, Topar village

2016 - Production of connection details of the pipe line for construction works
Atomic powered ice-braker Arctica

Atomic powered ice-braker Arctica

2017 - Production of pipe line blocks for the main steam system with acceptance RMRS
Yamal-SPG

Yamal-SPG

2017 - Production of connection pipe line details with additional testing for areas of Distant North
Kazan combined heat and power supply plant-3

Kazan combined heat and power supply plant-3

2016-2017 - Production of high and low pressure pipe lines
Yurubcheno-Tokhomskoe field deposit

Yurubcheno-Tokhomskoe field deposit

2016 - Production of bent elbow pieces of pipes 323,8х25,4 st.X65QS API 5L PSL 2 including acceptance by specialists of Samara ITC
Balhash combined heat and power supply plant

Balhash combined heat and power supply plant

2016 - Production of connection details of the pipe line for construction works
Tatneft Shashin-plant

Tatneft Shashin-plant

2016 - Production of details for welding for manufacturing water block №3 of the combined unit of hydrocracking of the Complex NP and NHZ AO «TANEKO»
Omsk oil refinery plant

Omsk oil refinery plant

2016 - Production of shaped-welded knee bends made upon drawings, diameter DN578, DN363, for manufacturing of the hot high pressure separator for construction an advanced oil refining complex
Kirishi oil refinery plant

Kirishi oil refinery plant

2016 - Production of over 600 tons of high pressure steam lines made of steel 12Х1МФ for technical reequipment regarding supply with high pressure steam for the facilities of ООО "KINEF"
FSUE "PO" Mayak"

FSUE "PO" Mayak"

Production of pipe parts according to OST 95-53-98, 95-83-84 OST, OST 95-10063-84. Production in the shortest time possible, regular consultations to harmonize the technical documentation.
Usinsk oil field

Usinsk oil field

In 2015-2016 works on steam pipeline installation in the Usinsk field are being performed.

Thanks to our design department, drawings were created very quickly and subsequently agreed with the customer.

If the semi-finished products were in stock the manufacturing was performed in the shortest time possible.
CHP AGK Achinsk

CHP AGK Achinsk

Production of high pressure bends for feed water pipeline replacement.
Mogilevskaya CHP-1

Mogilevskaya CHP-1

Production of high pressure pipelines for reconstruction of the turbine №3 and 4 of the first stage of construction.
Seversky Tube Works

Seversky Tube Works

Production of high pressure components according to customer's drawings for repairs.
Dzerzhinskaya TPP

Dzerzhinskaya TPP

Production of support-suspension system of molybdenum vanadium steel for repairs.
Izhevskaya CHP-1

Izhevskaya CHP-1

Supply of pipeline fittings and tubular products for the reconstruction works of CCGT-230MVt.
Sukhonsky Paper and Paperboard Plant

Sukhonsky Paper and Paperboard Plant

2015 Modernization of live steam pipeline on turbine generator №1.
Pipeline commissioning station on 1237km of pipeline Uzen-Atyrau-Samara

Pipeline commissioning station on 1237km of pipeline Uzen-Atyrau-Samara

At the end of 2015 were carried out works on the pipeline Uzen-Atyrau-Samara, the connection node to the oil pipeline.

We supplied goods for the pipeline: stamp-welded bends, bent branches, as well as tubular products. Thanks to the coordinated work all the goods were shipped in 1.5 months, thus there was no need to re-negotiate the installation time.
Seaport "Taman"

Seaport "Taman"

Complex supply of parts of pipelines of steel 20, 09G2S for construction of oil-loading racks.
GTU Karpenskaya

GTU Karpenskaya

Production of pats of steel 20A for field development of the western part of the Onboard license block of the Saratov region.
Kurskaya NPP

Kurskaya NPP

Production of pipeline components of the 4th safety class.
Komsomolsk gas field of LLC "Gazprom mining Noyabrsk"

Komsomolsk gas field of LLC "Gazprom mining Noyabrsk"

Timely and operational advice on the harmonization of regulatory and technical documents, rapid production of parts according to TS, organization of logistic flows to remote areas of the northern region.
Yaro-Yakhinskoye oil and gas field

Yaro-Yakhinskoye oil and gas field

Production of pipeline components for the field development.
Znamenskaya GTU TPP

Znamenskaya GTU TPP

Production of low pressure pipes for the construction of a new gas turbine power plant in municipality ZATO Znamensk, Astrakhan region.
Lipetskaya CHP-2

Lipetskaya CHP-2

Production of pipe fittings Du1600 to upgrade the cooling tower №3.
Kirovskaya CHP-3

Kirovskaya CHP-3

Manufacturing of pipeline components of low pressure made of steel 20, 09Г2С for the construction of CCGT-220MVt.
Chelyabinskaya GRES

Chelyabinskaya GRES

Organization of complex supply of fittings of own production and tubular products for the construction of the main building of energy unit №1.
Plant "Bridgestone"

Plant "Bridgestone"

2015 - Production of pipeline components for the new plant construction.
OOO LUKOIL-Permnefteorgsintez

OOO LUKOIL-Permnefteorgsintez

Production of fittings made of corrosion-resistant steel.
Novogorkovskaya CHP

Novogorkovskaya CHP

Modernisation with installation of two CCGT-165.

The work consisted in a complex provision of the above-mentioned object all required materials.

Main objective: rapid response, urgent production, and execution of works to ensure the rapid implementation of this project.

Novovoronezhskaya NPP-2

Novovoronezhskaya NPP-2

Complex equipment with all necessary materials for the construction of pipelines of 2nd and 3rd safety class under the strict control of JSC "Atomenergoproekt" according to the manufacturing and maintenance rules established by the State Corporation "Rosatom".
Sterlitamaksky Petrochemical Plant

Sterlitamaksky Petrochemical Plant

Production of steel bends 180-152x8 of steel 10X23H18 according to TS 3600-004-88598956-2014 for repairs.
CHP-1, Semey

CHP-1, Semey

Production and supply of pipeline components for the installation of: ESP unit st. №1 and LDPE st.№1,2 and deaerator unit 1.2 at st. №1.
Stadium «Otkritie»

Stadium «Otkritie»

Manufacturing of products according to our drawings developed by 5 working days, and shipping products as soon as possible.
Kaluga Turbine Works
Kaluga Turbine Works
JSC "NOVATEK Ust-Luga"
JSC "NOVATEK Ust-Luga"
Syzranskoye NPZ Oil Refinery
Syzranskoye NPZ Oil Refinery
Construction of the Central Stadium "Fischt"
Construction of the Central Stadium "Fischt"
Novopolotsky refinery
Novopolotsky refinery
Sovhoznoye PHG
Sovhoznoye PHG
JSC "Yayvinskaya GRES"
JSC "Yayvinskaya GRES"
Yuzhnouralskaya GRES-2
Yuzhnouralskaya GRES-2
Renovation "Usinskoye GPZ" Gas processing plant
Renovation "Usinskoye GPZ" Gas processing plant
Dzhubginskaya TPP
Dzhubginskaya TPP
Nizhnevartovskaya GRES
Nizhnevartovskaya GRES
JSC "Priargunskoye Industrial Mining and Chemical Union" (JSC "PPGHO")
JSC "Priargunskoye Industrial Mining and Chemical Union" (JSC "PPGHO")
Rostovskaya NPP
Rostovskaya NPP
JSC "Aluminium of Kazakhstan" CHP
JSC "Aluminium of Kazakhstan" CHP
LLP "Ekibastuzskaya GRES-1 named after Bulat Nurzhanov"
LLP "Ekibastuzskaya GRES-1 named after Bulat Nurzhanov"
Novy Urengoy Gas and Chemical Complex
Novy Urengoy Gas and Chemical Complex
CRR Launch Complex №3 Construction of the KGMO pipeline
CRR Launch Complex №3 Construction of the KGMO pipeline
Samburgskoye field
Samburgskoye field
Diaghilevskaya CHP
Diaghilevskaya CHP
Yamal LNG facility
Yamal LNG facility
Komsomolskoe refinery
Komsomolskoe refinery
Far Eastern Center of Shipbuilding and Ship Repair
Far Eastern Center of Shipbuilding and Ship Repair
Blagoveshenskaya TPP
Blagoveshenskaya TPP
Yakutskaya HPP-2
Yakutskaya HPP-2
Mendeleevskaya GeoTPP Sakhalin region
Mendeleevskaya GeoTPP Sakhalin region
Yugo-Zapadnaya CHPP
Yugo-Zapadnaya CHPP
Vyborg Pulp and Paper mill
Vyborg Pulp and Paper mill
Boguchansky Aluminium Plant
Boguchansky Aluminium Plant
Boiler room "Centralnaya" Lukoil
Boiler room "Centralnaya" Lukoil
Aktobe Rail and Beam Plant
Aktobe Rail and Beam Plant
Zhezkazganskaya CHP
Zhezkazganskaya CHP
Berezovskaya GRES
Berezovskaya GRES
Cherepovetskaya GRES
Cherepovetskaya GRES
Smolenskaya NPP
Smolenskaya NPP
Balakovskaya NPP
Balakovskaya NPP
Armenian NPP
Armenian NPP
Nizhnetourinskaya GRES
Nizhnetourinskaya GRES
Karagandinskaya GRES-1
Karagandinskaya GRES-1
Irkutsk CHP-6
Irkutsk CHP-6
Verkhnetagilskaya GRES
Verkhnetagilskaya GRES
Gas pipeline "Ananiev-Tiraspol-Izmail"
Gas pipeline "Ananiev-Tiraspol-Izmail"
Syrdarinskaya TPP
Syrdarinskaya TPP
CHP-2, Almaty
CHP-2, Almaty
CHP-4, Ulaanbaatar
CHP-4, Ulaanbaatar
Rospan International
Rospan International
Alexin combined heat and power supply plant
Alexin combined heat and power supply plant
Angarsk factory of polymeric materials
Angarsk factory of polymeric materials
Sumi Frunze-NPO
Sumi Frunze-NPO
Kaliningrad underground gas storage facility
Kaliningrad underground gas storage facility
Sevastopol thermal power plant
Sevastopol thermal power plant
Simferopol thermal power plant
Simferopol thermal power plant
Sokolovsko-Sarbayskoe mining and concentrating production group (SSGPO)
Sokolovsko-Sarbayskoe mining and concentrating production group (SSGPO)
GRES power plant, Topar village
GRES power plant, Topar village
Atomic powered ice-braker Arctica
Atomic powered ice-braker Arctica
Yamal-SPG
Yamal-SPG
Kazan combined heat and power supply plant-3
Kazan combined heat and power supply plant-3
Yurubcheno-Tokhomskoe field deposit
Yurubcheno-Tokhomskoe field deposit
Balhash combined heat and power supply plant
Balhash combined heat and power supply plant
Tatneft Shashin-plant
Tatneft Shashin-plant
Omsk oil refinery plant
Omsk oil refinery plant
Kirishi oil refinery plant
Kirishi oil refinery plant
FSUE "PO" Mayak"
FSUE "PO" Mayak"
Usinsk oil field
Usinsk oil field
CHP AGK Achinsk
CHP AGK Achinsk
Mogilevskaya CHP-1
Mogilevskaya CHP-1
Seversky Tube Works
Seversky Tube Works
Dzerzhinskaya TPP
Dzerzhinskaya TPP
Izhevskaya CHP-1
Izhevskaya CHP-1
Sukhonsky Paper and Paperboard Plant
Sukhonsky Paper and Paperboard Plant
Pipeline commissioning station on 1237km of pipeline Uzen-Atyrau-Samara
Pipeline commissioning station on 1237km of pipeline Uzen-Atyrau-Samara
Seaport "Taman"
Seaport "Taman"
GTU Karpenskaya
GTU Karpenskaya
Kurskaya NPP
Kurskaya NPP
Komsomolsk gas field of LLC "Gazprom mining Noyabrsk"
Komsomolsk gas field of LLC "Gazprom mining Noyabrsk"
Yaro-Yakhinskoye oil and gas field
Yaro-Yakhinskoye oil and gas field
Znamenskaya GTU TPP
Znamenskaya GTU TPP
Lipetskaya CHP-2
Lipetskaya CHP-2
Kirovskaya CHP-3
Kirovskaya CHP-3
Chelyabinskaya GRES
Chelyabinskaya GRES
Plant "Bridgestone"
Plant "Bridgestone"
OOO LUKOIL-Permnefteorgsintez
OOO LUKOIL-Permnefteorgsintez
Novogorkovskaya CHP
Novogorkovskaya CHP
Novovoronezhskaya NPP-2
Novovoronezhskaya NPP-2
Sterlitamaksky Petrochemical Plant
Sterlitamaksky Petrochemical Plant
CHP-1, Semey
CHP-1, Semey
Stadium «Otkritie»
Stadium «Otkritie»
+7 (831) 411-10-50
603002 Internatsionalnaya str., 100, Nizhny Novgorod
Fax: +7 (831) 429 04 86
e-mail: info@atlant-nn.com
Request a call

На нашем сайте мы используем cookie для сбора информации технического характера.
В частности, для персонифицированной работы сайта мы обрабатываем IP-адрес региона вашего местоположения.